|< 

< 

 

...

11

 

12

 

13

 

14

 

15

 

16

 

17

 

18

 

19

 

20

...

 

 >

 >|

Results 101 - 110 of 6358

Design study for electromechanical systems and wastewater extensions in the Presidential Palace building

2019 - PWO/19/11 - KREDO SAL

Planning of the kartaba road _Jbeil , Mount Lebanon

2019 - PWO/19/12 - Ministry of Public works and Transport

Lesson files of distribution networks and drinking water tanks in all Lebanese governorates

2019 - WAT/19/19 - Ministry of Energy and Water

Files of  the lessons of distribution networks and reservoirs for drinking water in the following towns:
Alman (John) - Alamat (Jbeil) - Aqtanit (Sidon) - Ain Dara (Aley) - Ain Al-Hoor (Chouf) - Ain Mowaffaq (Baabda) - Ain Zhalta - Spring of Al-Safa (Chouf) - Aqoura (Jbeil) - Alma Al-Shaab Tire) - Aramoun (Aley) - Freddes Chouf (Baroque) - The Two Towers (Chouf) - Shmeis (Chouf...

Study of the establishment of water drainage system in Dbayeh highway

2019 - PWO/19/15 - KREDO SAL

  • Initial report
  • Hydrological and hydraulic study file
  • Soil study and examination file
  • Study of the method of water drainage with a technical file of flat and longitudinal and transverse sections
  • A structural study of...

Transparency Guide for Procurement in Public Private Partnerships - Lebanon

2019 - GUI/19/3 - Lebanese Foundation for Permanent Civil Peace - USAID

This Guide will comprise the titles and relevant details to adopt for enchancing  transparency and consequently  accountability and towards increasing the economy and efficiency of the PPPs.
The Guide has accounted for practicality...

Actions taken by the National Authority of the Litani River to fight pollution in the Litani River Basin

2019 - ENV/19/1 - Litani River Authority - Justice and administration committee

Amendment of the Decree 1773 /1971 related to the internal Douma road plan _ Batroun

2019 - PWO/19/6 - Ministry of Public works and Transport

Ministry of Energy and Water- Directorate General of Oil TOR for the Directorate Automation

2019 - It/19/1 - CUB Engineering&Consulting

1. Introduction
2. Proposed Functional Architecture
3. Scope of Work
4. Project phases and Deliverables
5. Time and Duration of Contract
6. Payment Schedule
7. Evaluation Process

Technical Assistance Facility (TAF) for the Government of Lebanon - Court of Audit

2019 - DEVA/19/1 - Crown Agents

- Analytical report of the current financial post audit capabilities and procedures with a preliminary roadmap and recommendations  Report on Findings, Conclusions and Recommendations of First Mission,  July 2018
 - Financial Audit guidelines
- The 5 year Strategic Framework of the Court of Audi of Lebanon for the period 2019 , 2020
 

|< 

< 

 

...

11

 

12

 

13

 

14

 

15

 

16

 

17

 

18

 

19

 

20

...

 

 >

 >|

Results 101 - 110 of 6358
Contact Us

+(961) 1 371510

info@omsar.gov.lb