Title:
South Bekaa Irrigation Project: Feasibility Study Part 1 - Generalities and Present and Future Irrigation Land Use
Code:
WAT/f95/2
Supervisor:
Council for Development and Reconstruction - Litany River Authority
Author:
CADRES – Bureau Eng. Ziad K.Hajjar
Page Numbers:
161
Summary:
INTRODUCTION
Chapter 1: Generalities, Historical, project Description & previous feasibility study
1.1. Historical Review of the Project
1.2. South Bekaa Project Description
1.3. Previous Feasibility Study
Chapter 2: The Project Area
Basic Data
2.1. Location
2.2. Topography
2.3. Soil and irrigable potential
2.4. Climate
2.5. Land tenure
2.6. Water Rights
2.7. State of Exportation
2.8. State of the Topography and the Cadastre
2.9. Collective and Public Institutions
2.10. Private Establishments
Chapter 3: Flood Control and Drainage Problems
3.1. Flood and drainage problems
3.2. Flooded zones
3.3. Dewatering and Drainage
Year:
1995
Sub-Sector:
Energy and water