Title:

Planning Study about the Reorganization and Rebuilding of the Lebanese Postal Service: Technical Planning – Volume 2

Code:

POST/a95/4

Supervisor:

Ministry of Post and Telecommunications

Author:

Deutsche Post Consult Gmbh

Page Numbers:

191

Available at:

Available at OMSAR

Summary:

1. Planning Principles For Buildings and Rooms To be Mechanized 1.1. Checklist of Special Conditions For a Building with Respect To Postal Operational Requirements 1.2. Planning Principles For Traffic Ways In Buildings and Rooms To Be Mechanized 2. Operational and Technical Planning of Standardized Sorting Centers 2.1. Operational and Technical Planning of Standardized Sorting Centers 2.2. Technical Planning oOf Sorting Center M 3. Mechanization Planning of Standardized Sorting Centers 3.1. Mechanization Proposal Sorting Center Size S 3.2. Mechanization Proposal Sorting Center Size M 3.3. Mechanization Proposal Sorting Center Size L 4. Cost Estimation For Technical Sorting Equipment and Manual Sorting Equipment 4.1. Cost Estimation For Sorting Center Size S 4.2. Cost Estimation For A Sorting Center Size L 5. Transportation Network Planning 5.1. Planning and Optimization Road Transportation Network 5.2. Transportation Means 5.3. Workshop For Vehicles 5.4. Cost Estimation Regarding Vehicles Proposed 5.5. Number of Vehicles Taking Care of The Workshop Beirut 5.6. Number of Workstations Dependent on Vehicles Take Care of 6. Proposal For a New Postal Counter Services System (EPOS) Basic Information 6.1. Background 6.2. Historical Background about The Usage of Electronic Postal Counter System within The Deutsche Bundespost 6.3. The Postal Counter Service System Based on Distributed Data Processing (Named Electronic Postal Service – EPOS92) 7. Annexes

Year:

1995

Sub-Sector:

Telecommunications

Contact Us

+(961) 1 371510

info@omsar.gov.lb