|< 

< 

 

...

41

 

42

 

43

 

44

 

45

 

46

 

47

 

48

 

49

 

 >

 >|

Results 421 - 430 of 485

Environmental Administration and Legislation in Lebanon

1995 - ENV/f95/4 - Hyam Mallat

Introduction

Part 1: Analysis of the current administrative structure in Lebanon in terms of the environment
Part 2: Environmental Law

Solid Waste / Environmental Management Project - Environmental Impact Assessment Study

1995 - ENV/g95/1

1. Executive Summary
2. Negative Impact of the Project on the Environment
3. Waste Characterization
4. Number of Equivalent Inhabitants
5. Morphology of the Site Nature of the Soil
6. Agricultural Production
7. Republic of Lebanon

Lebanon – Solid Waste / Environment Management Project (Staff Appraisal Report)

1995 - ENV/g95/2

Loan and Project Summary

1. Background
2. The Project
3. Project Execution and Management
4. Environmental Assessment
5. Project Benefits and Risks
6. Agreements Reached and Recommendations
7. Annexes

Environmental management project / Solid waste - Environmental impact assessment (Environmental Assessment Summary - volume 1)

1995 - ENV/g95/3

1. Preliminary Methodology of choice
2. Site Choice Cripps
3. Choices criteria

Environmental management project / Solid waste - Environmental impact study (final report: environmental impact study of the Amroussieh incineration plant - volume 2)

1995 - ENV/g95/4

Chapter 1: preliminary
Chapter 2: structures, legislative, administrative and controversial
Chapter 3: description of the project
Chapter 4: Basic data Tables

Environmental Management / Solid Waste Project - Environmental Impact Study (Final Report: Environmental Impact Study of Zahle Fertilizer Station - Volume 3)

1995 - ENV/g95/5

Chapter 1: Preliminary
Chapter 2: Legislative, administrative and political structures
Chapter 3: Description of the project
Chapter 4: Basic data
Chapter 5: Predictable effects of installations on the environment
Chapter 6: Analysis of alternatives
Chapter 7: Measures planned to prevent, eliminate, reduce and if possible compensate for the damaging...

Environmental management project / Solid waste - Environmental impact study (final report: environmental impact study of the Saïda composting plant - volume 4)

1995 - ENV/g95/6

Chapter 1: Preliminary
Chapter 2: Legislative, administrative and controversial structures
Chapter 3: Description of the project
Chapter 4: Basic data
Chapter 5: Predictable effects of installations on
Chapter 6: Analysis of alternatives
Chapter 7: Measures planned to prevent, eliminate, reduce and if possible compensate for the damaging consequences of...

Environmental management project / Solid waste - Environmental impact study (final report: environmental impact study: general criteria for the choice of site for controlled landfill - volume 5)

1995 - ENV/g95/7

The World bank /IFC Lebanese Republic Solid Waste Environmental Management Project Environmental Assessment Summary

Sanitation of the City of Zahlé - Description - Equipment

1995 - ENV/h95/1

1. Degreasing station
1.1. Collector A
1.2. Collector B
1.3. Collector F
1.4. Belt conveyor
1.5. Capacity refusal container

2. Rellevage station (for the record)
2.1. Phase 1

3. Fine screen station
3.1. Fine screen with automatic cleaning system, between fur = 20mm
3.2. Motorized wall valve, DN500
3.3...

Sanitation project of the City of Zahlé - Wastewater network - Project cost summary

1995 - ENV/h95/2

Total for row A
Total for row B
Total for row C
Total for row D
Total for row D
Total for line E
Total for line F
Total for the Zahlé wastewater network

|< 

< 

 

...

41

 

42

 

43

 

44

 

45

 

46

 

47

 

48

 

49

 

 >

 >|

Results 421 - 430 of 485