Title:

Environmental management project / Solid waste - Baallbeck district Taibeh landfill - Topographic plan - Implantation Plan

Code:

ENV/g03/1

Supervisor:

Development and Reconstruction Council

Author:

Liban Consult

Page Numbers:

55

Available at:

Available at OMSAR

Summary:

• Chapter 1: Preliminary
• Chapter 2: Legislative, administrative and political structures
• Chapter 3: Description of the project

• 3.1. the project's objectives
• 3.2. Description of the process and recommended technology
• 3.3. Characteristics of the location
• 3.4. Pre-construction activities
• 3.5. Construction execution time
• 3.6. Validity of the type of treatment chosen

• Chapter 4: Basic data

• 4.1. Physical data
• 4.2. Biological data
• 4.3. Sociocultural data

• Chapter 5: Predictable effects of installations on the environment

• 5.1. How to analyze the effects
• 5.2. Change in the nature of land use (effects on the economic value of spaces)
• 5.3. Potential damage to landscape quality
• 5.4. Potential nuisances compared to the local population (nuisance on the local habitat)
• 5.5. Damage to the regime and quality of surface water
• 5.6. Expectation of the regime and quality of groundwater
• 5.7. Effect on site morphology and on ground stability
• 5.8. Effects on flora and fauna

• Chapter 6: Analysis of alternatives

• 6.1. Choice of waste disposal or treatment technology
• 6.2. Choice of site
• 6.3. Choice of farm

• Chapter 7: Measures planned to prevent, eliminate, reduce and if possible

• compensate for the damaging consequences of the project on the environment
• 7.1. Nature of the planned measures
• 7.2. Operational recommendations
• 7.3. Estimated costs of compensatory measures
• 7.4. Implementation of mitigative measures and controls

• Chapter 8: Environmental management and training

• 8.1. Description of the current situation
• 8.2. Management of the solid waste sector in the short term
• 8.3. Proposals for long-term solid waste management
• 8.4. Staff training
• 8.5. Strengthening the technical and financial capacities of management bodies
• 8.6. Public consultation and public information
• 8.7. Role and responsibilities of the various parties involved in the project

• Chapter 9: Control and surveillance

• 9.1. Waste collection
• 9.2. Monitoring and protection of access to the landfill
• 9.3. Waste control - bridge management - weighbridge
• 9.4. Operation of the landfill
• 9.5. Operating accidents and fire risks
• 9.6. Dump truck maintenance
• 9.7. Maintenance of the gardens and planned premises and roads
• 9.8. Operating documents to keep

• chapter 10: Conclusions

• Annex A: Estimate of the quantity of leachate
• Annex B: Photographic file of the site
• Annex C: Report on geotechnical reconnaissance work
• Annex D: Reports and results of the public consultation
• Annex E: Certificate of alignment and zoning corresponding to the landfill site
• Annex F: Plans file

Year:

2003

Sub-Sector:

Waste

Contact Us

+(961) 1 371510

info@omsar.gov.lb