Titre:

CONSTRUCTION OF QAISSAMANI DAM & DESIGN AND CONSTRUCTION OF THE WATER TREATMENT PLANT -VOLUME 3 LOT B

Code:

WAT/11/6

Sous la direction de:

COUNCIL FOR DEVELOPMENT AND RECONSTRUCTION

Auteur:

LIBANCONSULT AGM Ingénieurs Conseils

Nombre de pages:

431

Contenu:

STANDARDS -STANDARDS AND CODES -EQUIVALENCY OF STANDARDS AND CODES -SILENCE OF SPECIAFICATIONS -SITE INSTALLATION -INTENT OF CONTRACT -CONTRACTOR’S YARDS, STORES AND ACCOMMODATION FRO WORKMEN -OFFICES, TRANSPORT, EQUIPMENT AND SERVICES FOR ENGINEER -PROTECTIVE -WATER AND ELECTRICITY SUPPLY -SITE ACCESS ROUTES -REMOVAL OF THE GENERAL INSTALLATIONS AND CLEANING THE SITE -MATERIALS -SOURCE OF SUPPLY AND QUALITY REQUIREMENTS -PROPRIETARY MATERIALS -QUALITY -APPROVAL -WORK EXECUTION -TEMPORARY WORK -SETTING OUT OF THE WORKS -BOUNDARIES OF WORKS SHOP DRAWINGS/EXECUTION DRAWINGS -AS-BUILT DRAWINGS -LEVEL DATUM -LEVELS AND DIMENSIONS -BENCHMARKS -WORK THROUGH PRIVATED PROPERTY -PUBLIC UTILITY MAINS AND SERVICES, LOCATING, ETS -ACCESS TO PROPERTIES -CONNECTIONS TO EXISTING UTILITIES -CONTRACTOR’S RESPONSIBILITY FOR UTILITY PROPERTIES -EXPLOSIVES -CONTROL -SAFETY AND ENVIRONMENTAL CONDITIONS -SAFETY -SIGN BOARDS AND SAFETY BARRIES -ENVIRONMENTAL ASPECTS -CONTROL OF DUST -PERCAUTIONS AGAINST CONTAMILNATION OF THE WORKS -SAFEGUARDS TO EXISTING PIPES, CABLES , STRUCTURES -FLAGGING, LIGHTING, WATCHING AND TRAFFIC CONTROL -CONSISTACE AND WORKS DESCRIPTION -INTRODUCTION -RESERVPOR CA[ACOTU -DESCRIPTION OF THE WORKS -SOURCE OF SUPPLY AND QUALITY OF MATERIALS -FILL MATERIALS -CONCRETE MATERIALS -REINFORCING STEEL -STEEL PIPES AND FITTINGS -GALVANIZED STEEL PIPES AND FITTINGS -WORK EXECUTION -EXCAVATION -FILL AND BACKFIL -EXECUTION OF THE BITUMEN LAYER -WIRE ENCELOSED RIPRAP (GABIONS) -MEASURING DEVICES -PIPOES INSTALLATION -CONCRETE WORKS -PERIPHICAL ROAD WORKS -AUSCULTATION EQUIPMENT

Année:

2011

Sous-catégorie:

Energie et Eau

Contactez nous

+(961) 1 371510

info@omsar.gov.lb