STANDARDS
-STANDARDS AND CODES
-EQUIVALENCY OF STANDARDS AND CODES
-SILENCE OF SPECIAFICATIONS
-SITE INSTALLATION
-INTENT OF CONTRACT
-CONTRACTOR’S YARDS, STORES AND ACCOMMODATION FRO WORKMEN
-OFFICES, TRANSPORT, EQUIPMENT AND SERVICES FOR ENGINEER
-PROTECTIVE
-WATER AND ELECTRICITY SUPPLY
-SITE ACCESS ROUTES
-REMOVAL OF THE GENERAL INSTALLATIONS AND CLEANING THE SITE -MATERIALS
-SOURCE OF SUPPLY AND QUALITY REQUIREMENTS
-PROPRIETARY MATERIALS
-QUALITY
-APPROVAL
-WORK EXECUTION
-TEMPORARY WORK
-SETTING OUT OF THE WORKS
-BOUNDARIES OF WORKS
SHOP DRAWINGS/EXECUTION DRAWINGS
-AS-BUILT DRAWINGS
-LEVEL DATUM
-LEVELS AND DIMENSIONS
-BENCHMARKS
-WORK THROUGH PRIVATED PROPERTY
-PUBLIC UTILITY MAINS AND SERVICES, LOCATING, ETS
-ACCESS TO PROPERTIES
-CONNECTIONS TO EXISTING UTILITIES
-CONTRACTOR’S RESPONSIBILITY FOR UTILITY PROPERTIES
-EXPLOSIVES
-CONTROL
-SAFETY AND ENVIRONMENTAL CONDITIONS
-SAFETY
-SIGN BOARDS AND SAFETY BARRIES
-ENVIRONMENTAL ASPECTS
-CONTROL OF DUST
-PERCAUTIONS AGAINST CONTAMILNATION OF THE WORKS
-SAFEGUARDS TO EXISTING PIPES, CABLES , STRUCTURES
-FLAGGING, LIGHTING, WATCHING AND TRAFFIC CONTROL
-CONSISTACE AND WORKS DESCRIPTION
-INTRODUCTION
-RESERVPOR CA[ACOTU
-DESCRIPTION OF THE WORKS
-SOURCE OF SUPPLY AND QUALITY OF MATERIALS
-FILL MATERIALS
-CONCRETE MATERIALS
-REINFORCING STEEL
-STEEL PIPES AND FITTINGS
-GALVANIZED STEEL PIPES AND FITTINGS
-WORK EXECUTION
-EXCAVATION
-FILL AND BACKFIL
-EXECUTION OF THE BITUMEN LAYER
-WIRE ENCELOSED RIPRAP (GABIONS)
-MEASURING DEVICES
-PIPOES INSTALLATION
-CONCRETE WORKS
-PERIPHICAL ROAD WORKS
-AUSCULTATION EQUIPMENT